Teck tests carbon capture use and storage in Canada

Date:

“The pilot also provides us with a technical platform to assist our steelmaking coal customers in materially reducing the carbon intensity of their steel production,” president and chief executive, Don Lindsay, said in the statement.

The plant will capture carbon dioxide (CO2) from the acid plant flue gas at Teck’s Trail Operations at a rate of 3 tonnes per day. The project will also evaluate options for the utilization and/or storage of captured emissions at the smelting and refining complex.

The pilot carbon capture utilization and storage (CCUS) facility. (Image courtesy of Teck Resources.)

If successful, the facility could be scaled up to an industrial CCUS plant with the potential to capture over 100,000 tonnes of CO2 a year at Trail Operations, the equivalent emissions of more than 20,000 cars.

Part of the Vancouver-based company’s carbon reduction plan includes integrating electric, hybrid and hydrogen-fuelled…

Read more…

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Tampa RV giant Lazydays to delist from Nasdaq

Tampa-based Lazydays Holdings Inc., one of Florida’s most recognized...

Granite Geek: New Hampshire might get access to ‘balcony solar’

I had solar panels put on my roof six...

TSX Today: What to Watch for in Stocks on Monday, November 10

Despite firm gold and silver prices, Canadian stocks...

While BNB and DOT Struggle Under Market Pressure, BlockDAG’s Presale Soars Past $435M!

As market-wide fear grips the sector, the Binance Coin...