B2Gold shares down on new Goose mine plan with stricter resource model

Date:

B2Gold (TSX: BTO, NYSE AMERICAN: BTG, NSX: B2G) has provided a new life-of-mine plan for the Goose project in Nunavut, Canada that confirms its previous timeline and cost estimates, but lowered its high-confidence resource count.

Goose represents B2Gold’s first project in the Back River gold district, which consists of 11 mineral claims blocks along an 80-km belt. The proposed mine is scheduled to pour its first gold in the second quarter of this year, ramping up to commercial production the following quater.

The company’s new mine plan is based on a technical report containing an updated gold reserve estimate for the Goose project, totalling 11.3 million tonnes grading 6.82 grams per tonne gold for a total of 2.48 million oz. This reserve base is expected to support continuous gold production over nine-year mine life, with annual production of 270,000 oz., including 300,000 oz. during the first six…

Read more…

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Tampa RV giant Lazydays to delist from Nasdaq

Tampa-based Lazydays Holdings Inc., one of Florida’s most recognized...

Granite Geek: New Hampshire might get access to ‘balcony solar’

I had solar panels put on my roof six...

TSX Today: What to Watch for in Stocks on Monday, November 10

Despite firm gold and silver prices, Canadian stocks...

While BNB and DOT Struggle Under Market Pressure, BlockDAG’s Presale Soars Past $435M!

As market-wide fear grips the sector, the Binance Coin...