New plans for LithiumBank’s Boardwalk and Park Place projects in Alberta

Date:

The pilot plant aims to show the lithium application can be scaled for commercial production. The pilot plant will produce a concentrated product to test further processing steps for making battery-grade lithium carbonate or lithium hydroxide monohydrate.

Since the beginning of the year, LithiumBank has achieved significant milestones, including updated preliminary economic assessments (PEA). These deposits, among the largest in North America, are expected to cause minimal surface and water disturbance.

At Boardwalk, LithiumBank plans to drill a formerly producing hydrocarbon well to collect brine and confirm reservoir details, such as porosity and permeability. The well will be extended to about 2,830 metres to collect more brine samples, conduct chemical analysis, and perform various tests to determine deliverability and permeability.

Detailed geological analysis and subsurface reservoir modeling will help improve the resource…

Read more…

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Tampa RV giant Lazydays to delist from Nasdaq

Tampa-based Lazydays Holdings Inc., one of Florida’s most recognized...

Granite Geek: New Hampshire might get access to ‘balcony solar’

I had solar panels put on my roof six...

TSX Today: What to Watch for in Stocks on Monday, November 10

Despite firm gold and silver prices, Canadian stocks...

While BNB and DOT Struggle Under Market Pressure, BlockDAG’s Presale Soars Past $435M!

As market-wide fear grips the sector, the Binance Coin...