Wallbridge Mining Exploration Drilling Continues to Expand Mineralized Footprint of Martiniere Deposit Intercepting Multiple High Grade Gold Structures

Date:

TORONTO, June 02, 2025 (GLOBE NEWSWIRE) — Wallbridge Mining Company Limited (TSX: WM, OTCQB:WLBMF) (“Wallbridge” or the “Company”) today announced the results for the first eleven holes of its 2025 exploration drilling program at its 100% owned Martiniere gold project (“Martiniere”). The results include multiple high-grade gold intercepts along extensions to four of the zones targeted along the Bug Lake (“BL”) deformation corridor, and at a fifth newly identified target located approximately 300 metres north of the BL deformation corridor.

Highlights:






Dragonfly  
  MR-25-111 40.99 g/t Au over 2.3m including 59.60 g/t Au over 1.5m
  MR-25-112 20.91 g/t Au over 2.7m including 51.90 g/t Au over 1.0m
  MR-25-116 28.44 g/t Au over 1.2m including 52.80 g/t Au over 0.6m;
    18.54 g/t Au over 4.0m including 65.80 g/t Au over 1.0m
  MR-25-117 7.61 g/t Au over 2.1m including…

Read more…

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Tampa RV giant Lazydays to delist from Nasdaq

Tampa-based Lazydays Holdings Inc., one of Florida’s most recognized...

Granite Geek: New Hampshire might get access to ‘balcony solar’

I had solar panels put on my roof six...

TSX Today: What to Watch for in Stocks on Monday, November 10

Despite firm gold and silver prices, Canadian stocks...

While BNB and DOT Struggle Under Market Pressure, BlockDAG’s Presale Soars Past $435M!

As market-wide fear grips the sector, the Binance Coin...