Rokmaster announces robust economics for Revel Ridge project in BC

Date:

The economics presented in the PEA study were calculated from metals prices of $1,850/oz. gold, $23.00/oz. silver, $1.26/lb. zinc and $0.90/lb. lead. Rokmaster pointed out that today’s market prices are higher for metals, notably gold (currently at over $2,000/oz.).

The PEA considers an underground mine with on-site treatment of the mined material by particle sorting followed by conventional milling, and flotation to produce separate lead and zinc concentrates for sale to third-party smelters, in combination with on-site treatment of refractory gold concentrates to produce gold-silver doré.

A processing capacity of 2,920 tonnes per day will result in a production lifespan of 11.4 years. During that period, the Revel Ridge mine is expected to deliver average annual payable production of 158,000 oz. of gold equivalent (114,000 oz. gold, 940,000 oz. silver, 32.6 million lb. zinc and 19.6 million lb. lead).

The PEA is derived…

Read more…

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Tampa RV giant Lazydays to delist from Nasdaq

Tampa-based Lazydays Holdings Inc., one of Florida’s most recognized...

Granite Geek: New Hampshire might get access to ‘balcony solar’

I had solar panels put on my roof six...

TSX Today: What to Watch for in Stocks on Monday, November 10

Despite firm gold and silver prices, Canadian stocks...

While BNB and DOT Struggle Under Market Pressure, BlockDAG’s Presale Soars Past $435M!

As market-wide fear grips the sector, the Binance Coin...