Osisko Mining Turns Power on at Windfall Site

Date:

TORONTO, Jan. 18, 2024 (GLOBE NEWSWIRE) — Osisko Mining Inc. (TSX: OSK “Osisko” or the “Corporation”) is pleased to provide the following corporate updates on the Corporation’s activities for 2024.

Grid Power Arrives at Windfall

The 85 km long 69 kV hydro-electric power line built, owned and operated by the Waswanipi Cree First Nation has been completed on schedule, and grid power has successfully been connected to the Windfall Project. The use of hydroelectricity at the Windfall Project marks the switching over from diesel generated electricity to operate the camp and underground infrastructure and will significantly reduce both power costs and greenhouse gas emissions at the site.

Regional Exploration Program

Osisko has begun a 35,000 meter drill program on the Urban-Barry properties as part of its 70% earn-in option with Bonterra Resources Inc. (please see Osisko’s news release dated September 25, 2023). The program will…

Read more…

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Tampa RV giant Lazydays to delist from Nasdaq

Tampa-based Lazydays Holdings Inc., one of Florida’s most recognized...

Granite Geek: New Hampshire might get access to ‘balcony solar’

I had solar panels put on my roof six...

TSX Today: What to Watch for in Stocks on Monday, November 10

Despite firm gold and silver prices, Canadian stocks...

While BNB and DOT Struggle Under Market Pressure, BlockDAG’s Presale Soars Past $435M!

As market-wide fear grips the sector, the Binance Coin...