Minera Alamos expands into US with acquisition of Sabre Gold Mines

Date:

The economics are based on a total resource estimate of 1.2 million tonnes grading 7.74 grams per tonne gold (300,000 contained oz.) in the measured and indicated category and 970,000 tonnes grading 6.30 g/t gold (197,000 contained oz.) in the inferred category.

The 2023 PEA represents a restart plan for the past-producing mine at Copperstone that produced a reported 514,000 oz. of gold between 1987 and 1993 from open pit mining and later had a brief period of underground mining. Since all facilities envisioned in the PEA are located in “brownfields” locations, the project’s water and surface rights have in place for years, and the mine is fully permitted for restart.

The PEA gave Copperstone an after-tax net present value of $89.3 million (using a 5% discount rate and $2,000 gold price), an internal rate of return of 71.1% and a payback period of 1.3 years. The initial mine life is estimated at 5.7 years, and…

Read more…

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Tampa RV giant Lazydays to delist from Nasdaq

Tampa-based Lazydays Holdings Inc., one of Florida’s most recognized...

Granite Geek: New Hampshire might get access to ‘balcony solar’

I had solar panels put on my roof six...

TSX Today: What to Watch for in Stocks on Monday, November 10

Despite firm gold and silver prices, Canadian stocks...

While BNB and DOT Struggle Under Market Pressure, BlockDAG’s Presale Soars Past $435M!

As market-wide fear grips the sector, the Binance Coin...