The latest results show that copper-gold mineralization extends 885 metres beneath the Springer pit floor. These findings will help remodel the Springer zone, optimize pit designs, improve mine scheduling, and potentially lead to pit expansions and further drilling.
Drilling highlights
Hole SD-24-183 intersected 160 metres grading 0.42% copper and 0.43 g/t gold from 7.5 metres depth, including 18.65 metres of 1.67% copper and 1.57 g/t gold. This interval also intercepted 27.5 metres of 0.12% molybdenum from 107.5 metres; this molybdenum grade is the highest ever intersected in the Springer zone.
Hole SD-24-190 intersected 249.0 metres grading 0.33% copper and 0.39 g/t gold, starting from 3.0 metres depth, including 109.5 metres of rock grading 0.51% copper and 0.54 g/t gold.
Hole SD-24-191 intersected 304.0 metres grading 0.24% copper and 0.27 g/t gold, starting from 6.0 metres depth, including 34.0 metres grading 0.35% copper…


