Frontier Lithium’s drilling at Spark pegmatite continues to return robust grades

Date:

Another hole (DDH PL-078-22) intersected 104.9 metres of pegmatite from 120.4 to 225.3 metres averaging 1.58% Li2O, and a second 33.5-metre pegmatite zone from 246.7 to 280.2 metres averaging 1.63% Li2O.

“We are pleased with the drilling results from the 2022 drill program to date, with the Spark deposit remaining open in all directions. The focus continues to be at depth and to the west where the grade and thicknesses of the deposit remain robust.” stated VP exploration Garth Drever.

The initial objective of Phase XII drill program, which began in May and finished in October with 14,641 metres in 45 holes, was to convert inferred material to the indicated category for the planned open pit, in preparation for a pre-feasibility study on the PAK lithium project.

The latter half of the program, however, also included geotechnical drilling for ground control and pit design purposes, as well as step-out drilling to define…

Read more…

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Tampa RV giant Lazydays to delist from Nasdaq

Tampa-based Lazydays Holdings Inc., one of Florida’s most recognized...

Granite Geek: New Hampshire might get access to ‘balcony solar’

I had solar panels put on my roof six...

TSX Today: What to Watch for in Stocks on Monday, November 10

Despite firm gold and silver prices, Canadian stocks...

While BNB and DOT Struggle Under Market Pressure, BlockDAG’s Presale Soars Past $435M!

As market-wide fear grips the sector, the Binance Coin...