The initial objective for the Phase XII drill program was focused on converting the inferred resource within the Spark deposit to the indicated category in preparation for a pre-feasibility study (PFS) on the PAK project.
The latter half of the program included geotechnical drilling for ground control and pit design purposes as well as step out drilling to define the eastern and western extents of the ore body.
Highlights from the latest results include DDH PL-094-22, which was designed to define the western extent of the Spark pegmatite and to target the recently discovered NW Spark zone. This hole was the first indication that the NW zone was connected to the main Spark pegmatite at depth, intersecting 125.9 metres of pegmatite averaging 1.51% Li2O.
Another hole DDH PL-098-22 was designed to follow up on the results from PL-094-22 and confirmed that the NW zone is in fact connected to the main Spark ore body at depth,…


