Collective Mining Expands Apollo System in Three Locations with Drill Results Including 560.05 Metres at 1.83 g/t Gold Equivalent

Date:

TORONTOMarch 12, 2024 /CNW/ – Collective Mining Ltd. (TSX: CNL) (OTCQX: CNLMF) (FSE: GG1) (“Collective” or the “Company”) is pleased to announce assay results for two holes drilled into the Apollo Porphyry System (“Apollo”) at the Guayabales Project in Caldas, Colombia. Both holes increased the overall dimensions of Apollo with APC-92 expanding the southern portion of the system to the east and the west while APC-93 expanded the system in the north.

The company presently has three drill rigs operating at the project with holes being drilled at the Apollo, Olympus Deeps and Trap targets respectively. A fourth rig has been mobilized to the Box target with drilling expecting to begin in April.

Ari Sussman, Executive Chairman commented: “We continue to see exciting results across the various targets at our Guayabales project as our aggressive 40,000 metre drill program for 2024 takes shape.  Our exploration goal for the year is…

Read more…

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Tampa RV giant Lazydays to delist from Nasdaq

Tampa-based Lazydays Holdings Inc., one of Florida’s most recognized...

Granite Geek: New Hampshire might get access to ‘balcony solar’

I had solar panels put on my roof six...

TSX Today: What to Watch for in Stocks on Monday, November 10

Despite firm gold and silver prices, Canadian stocks...

While BNB and DOT Struggle Under Market Pressure, BlockDAG’s Presale Soars Past $435M!

As market-wide fear grips the sector, the Binance Coin...