Collective Mining Encounters Strong Porphyry Mineralization in the Current Hole being Drilled at Trap; Mobilizes Second Rig

Date:

TORONTO, Feb. 6, 2024 /CNW/ – Collective Mining Ltd. (TSX: CNL) (OTCQX: CNLMF) (FWB: GG1) (“Collective” or the “Company”) is pleased to announce that a second rig has been mobilized to the Trap target (“Trap”) due to strong visual mineralization observed in follow up drilling currently underway. Trap is one of a series of porphyry targets within the Company’s Guayabales Project located in Caldas Colombia. The Company’s 2024 exploration plan includes up to 40,000 metres of diamond drilling with three rigs currently operating and a fourth rig anticipated to start drilling by the middle of February 2024.

Trap Highlights (see Figures 1-4)

  • The Company recently announced the discovery of a gold rich porphyry system at Trap which is located approximately 3.5 kilometres to the northeast of the flagship Apollo system. The Trap target covers a large surface area measuring approximately 2 kilometres by 2 kilometres with assay results previously…

Read more…

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Tampa RV giant Lazydays to delist from Nasdaq

Tampa-based Lazydays Holdings Inc., one of Florida’s most recognized...

Granite Geek: New Hampshire might get access to ‘balcony solar’

I had solar panels put on my roof six...

TSX Today: What to Watch for in Stocks on Monday, November 10

Despite firm gold and silver prices, Canadian stocks...

While BNB and DOT Struggle Under Market Pressure, BlockDAG’s Presale Soars Past $435M!

As market-wide fear grips the sector, the Binance Coin...