China’s secret 2-blade wind turbine runs 500 days with 99.3% uptime

Date:

A Chinese green technology and wind power giant has made a significant breakthrough after revealing that its innovative two-blade onshore smart turbine prototype has completed over 500 days of stable operation.

World-leading clean tech company Envision Energy announced that the smart onshore wind turbine achieved a remarkable availability rate of 99.3 percent.

The prototype also recorded 2,444 hours of Mean Time Between Failures (MTBF) and reached 3,048 full-load equivalent hours per year, thus matching the output of traditional three-blade turbines operating at the same site.

The firm revealed that the innovative turbine proved itself a viable alternative to conventional three-blade systems, and successfully overcame design challenges that had historically hindered two-blade models.

Redefining wind turbines

Based on Envision Energy’s Model X onshore platform, the wind turbine is a result of over a decade of…

Read more…

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Tampa RV giant Lazydays to delist from Nasdaq

Tampa-based Lazydays Holdings Inc., one of Florida’s most recognized...

Granite Geek: New Hampshire might get access to ‘balcony solar’

I had solar panels put on my roof six...

TSX Today: What to Watch for in Stocks on Monday, November 10

Despite firm gold and silver prices, Canadian stocks...

While BNB and DOT Struggle Under Market Pressure, BlockDAG’s Presale Soars Past $435M!

As market-wide fear grips the sector, the Binance Coin...