Century files feasibility study for Joyce Lake DSO project

Date:

Joyce Lake high-grade mineral reserves are reported at a diluted cut-off grade of 55% iron. The cut-off grades and pit designs are considered appropriate for an iron ore price of $117.53/t for high-grade and a recovery of 98%.

Joyce Lake low-grade mineral reserves are reported at a diluted cut-off grade of 52% iron and below the higher cut-off grades. It is planned that low-grade mineral reserves within the designed pits will be stockpiled during pit operation and processed during pit closure. The low-grade cut-off is considered appropriate for an iron ore price of $61.14/t for low-grade and a process recovery of 98%.

The report claims the initial capital cost estimate of the project is C$270 million which excludes investment of C$58 million to acquire pre-production capability for product handling at rail and ship-loading facilities.

Read more…

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Tampa RV giant Lazydays to delist from Nasdaq

Tampa-based Lazydays Holdings Inc., one of Florida’s most recognized...

Granite Geek: New Hampshire might get access to ‘balcony solar’

I had solar panels put on my roof six...

TSX Today: What to Watch for in Stocks on Monday, November 10

Despite firm gold and silver prices, Canadian stocks...

While BNB and DOT Struggle Under Market Pressure, BlockDAG’s Presale Soars Past $435M!

As market-wide fear grips the sector, the Binance Coin...