Canada climate goals set high hurdle for Suncor oil sands mine extension

Date:

The same day, Guilbeault approved Equinor’s huge Bay du Nord offshore drilling project in the north Atlantic Ocean, expected to produce crude with an emissions intensity of eight kilograms of carbon per a barrel. Suncor’s existing Base Mine emits 42 kilograms a barrel of carbon.

The contrast underlines how Canada, the world’s fourth-largest crude producer, is distinguishing between higher and lower-carbon fossil fuel production as it aims to slash emissions over the next three decades.

Canada will also require new oil and gas projects to show their emissions are “best in class”, without defining what exactly that class would be, and able to hit net-zero by 2050.

“It’s a big challenge for an oil sands project, and I’m not convinced they’ll even be able to do it,” said Chris Severson-Baker, Alberta regional director at the Pembina Institute, a clean energy think tank.

Guilbeault’s letter, published on the Impact…

Read more…

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Tampa RV giant Lazydays to delist from Nasdaq

Tampa-based Lazydays Holdings Inc., one of Florida’s most recognized...

Granite Geek: New Hampshire might get access to ‘balcony solar’

I had solar panels put on my roof six...

TSX Today: What to Watch for in Stocks on Monday, November 10

Despite firm gold and silver prices, Canadian stocks...

While BNB and DOT Struggle Under Market Pressure, BlockDAG’s Presale Soars Past $435M!

As market-wide fear grips the sector, the Binance Coin...