Defense Metals drills 221 metres of 2.14% TREO, including 3.52% at Wicheeda

Date:

The company has drilled over 5,500 metres in 18 holes this year as part of the Wicheeda resource delineation and pit geotechnical program. The company has released assays for a total of 2,493 metres in seven holes. Assays for the remaining 11 holes totalling 3,017 m are expected in the coming weeks and months.

“With these additional assay results our 2022 drilling continues to yield significant intervals of the high-grade REE dolomite carbonatite lithology,” Defense Metals president Luisa Moreno said in a release. “Recent flotation variability test work has shown this type of mineralization consistently delivers high-grade mineral concentrates greater than 40% TREO, at recoveries in excess of 80%.”

The 2021 preliminary economic assessment (PEA) for Wicheeda project demonstrated an after-tax net present value (8% discount) of C$517 million and an internal rate of return of 18%. A unique advantage of the project is the…

Read more…

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Tampa RV giant Lazydays to delist from Nasdaq

Tampa-based Lazydays Holdings Inc., one of Florida’s most recognized...

Granite Geek: New Hampshire might get access to ‘balcony solar’

I had solar panels put on my roof six...

TSX Today: What to Watch for in Stocks on Monday, November 10

Despite firm gold and silver prices, Canadian stocks...

While BNB and DOT Struggle Under Market Pressure, BlockDAG’s Presale Soars Past $435M!

As market-wide fear grips the sector, the Binance Coin...