Big Ridge keeps intersecting gold at past-producing Hope Brook project in Newfoundland

Date:

The latest results include the final drill holes in 2021 as well as those completed after the resumption of drilling in January 2022, which targeted the shallow southwestern extension of the Hope Brook deposit.

Results from 2021 drilling was highlighted by an intercept of 1.09 g/t gold over 33 metres, including 4.52 g/t gold over 4.1 metres. From the 2022 drilling, one drill hole intersected 1.64 g/t gold over 20.8 metres, including 5.77 g/t gold over 4.7 metres, and another intersected 1.41 g/t gold over 15.1 metres, including 3.25 g/t gold over 4.2 metres.

“Drilling continues to intercept gold and copper mineralization outside the current resource envelope to the southwest and 100% of the drill results received to date have intersected gold mineralization, suggesting Hope Brook remains open for potential resource expansion,” said CEO Mike Bandrowski in a news release.

The Phase 1 drilling will continue until August, with…

Read more…

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Tampa RV giant Lazydays to delist from Nasdaq

Tampa-based Lazydays Holdings Inc., one of Florida’s most recognized...

Granite Geek: New Hampshire might get access to ‘balcony solar’

I had solar panels put on my roof six...

TSX Today: What to Watch for in Stocks on Monday, November 10

Despite firm gold and silver prices, Canadian stocks...

While BNB and DOT Struggle Under Market Pressure, BlockDAG’s Presale Soars Past $435M!

As market-wide fear grips the sector, the Binance Coin...