TORONTO, Nov. 06, 2024 (GLOBE NEWSWIRE) — Wallbridge Mining Company Limited (TSX:WM, OTCQB:WLBMF) (“Wallbridge” or the “Company”) today announced the results of the Phase 2 exploration drilling program at its 100% owned Martiniere gold project (“Martiniere”) which returned multiple high grade gold intercepts from three exploration targets along the Bug Lake (“BL”) deformation zone located within 500 metres (“m”) of the currently delineated mineral resource.
Highlights
Significant high grade gold intercepts returned from the Phase 2 drilling program at Martiniere include:
| BL North | 5.78 g/t Au over 3.9 m including 21.56 g/t Au over 0.9 m in hole MR-24-099 |
| Horsefly | 15.63 g/t Au over 11.0 m including 15.18 g/t over 2.3 m, 37.13 g/t Au over 1.8 m, 41.68 g/t Au over 1.2 m & 23.18 g/t Au over 0.8 m, and 7.24 g/t Au over 6.9 m including 17.56 g/t Au over 1.9 m & 6.88 g/t Au over 1.3 m in hole… |


