E3, Pure Lithium to test production of lithium metal batteries from Alberta brine

Date:

Under the new agreement, the parties will work together over the next 12 months to complete a rigorous techno-economic model, continue the joint scale-up efforts, and design a lithium metal anode and battery pilot facility to be built near Calgary, using lithium from concentrate generated by E3.

Through this work, E3 and Pure Lithium will assess the technical and economic criteria of a commercial lithium metal battery facility that would be located next to the lithium production in Alberta.

Upon successful completion, they will evaluate the next steps, including the operation of the pilot, which is designed to produce 200 kg of lithium metal anodes used in lithium metal vanadium rechargeable batteries.

The collaboration would lead to advancement towards the world’s first vertically integrated lithium metal battery technology, the companies said.

The combined process, according to E3, eliminates the need to produce a lithium…

Read more…

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Tampa RV giant Lazydays to delist from Nasdaq

Tampa-based Lazydays Holdings Inc., one of Florida’s most recognized...

Granite Geek: New Hampshire might get access to ‘balcony solar’

I had solar panels put on my roof six...

TSX Today: What to Watch for in Stocks on Monday, November 10

Despite firm gold and silver prices, Canadian stocks...

While BNB and DOT Struggle Under Market Pressure, BlockDAG’s Presale Soars Past $435M!

As market-wide fear grips the sector, the Binance Coin...