West Red Lake hits high-grade gold at Madsen mine

Date:

  • Hole MM24X-03-5195-018:
    • 10 metres at 13.40 g/t gold from 82 metres;
    • 1 metre at 17.75 g/t gold from 82 metres;
    • 1 metre at 85.61 g/t gold from 88.3 metres;
    • 1 metre at 14.05 g/t gold from 89.3 metres.
  • Hole MM24X-03-5127-012:
    • 3 metres at 12.21 g/t gold from 58 metres;
    • 1 metre at 32.84 g/t gold from 60 metres.
  • Hole MM24X-03-5195-015:
    • 16.98 metres at 3.12 g/t gold from 82 metres;
    • 0.98 metre at 11.78 g/t gold from 72.5 metres;
    • 1 metre at 14.69 g/t gold from 74.5 metres;
    • 0.79 metre at 15.60 g/t gold from 87.2 metres.

“With the team now working towards a planned mine restart in the second half of 2025, the drills at Madsen will continue to delineate and define the high-value mineral inventory needed to support that objective,” Shane Williams, president and CEO, stated.

The Madsen mine currently boasts an indicated resource of 1.65 million oz. of gold grading 7.4 g/t gold, along with an inferred resource of 0.37 million oz….

Read more…

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Tampa RV giant Lazydays to delist from Nasdaq

Tampa-based Lazydays Holdings Inc., one of Florida’s most recognized...

Granite Geek: New Hampshire might get access to ‘balcony solar’

I had solar panels put on my roof six...

TSX Today: What to Watch for in Stocks on Monday, November 10

Despite firm gold and silver prices, Canadian stocks...

While BNB and DOT Struggle Under Market Pressure, BlockDAG’s Presale Soars Past $435M!

As market-wide fear grips the sector, the Binance Coin...