2024-04-04 | TSX:STLR | Press Release

Date:

STLLR Gold Inc. (TSX: STLR) (OTCQX: STLRF) (FSE: O9D) (“STLLR” or the “Company”) announces the remaining assay results from the infill and confirmatory drilling program at the Windjammer South Deposit at the Golden Highway Area (western end) of the Tower Gold Project in Timmins, Ontario, Canada. STLLR appoints James Gagne, P.Eng., MBA, as the Vice President, Projects & Technical Services.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20240404998068/en/

Figure 1: Tower Gold Project – General Location Map (Graphic: Business Wire)

Table 1: Windjammer South Drilling Highlights (See Figures 2 and 3 for the drill location map and section views):

Hole ID

Deposit

Result

MGH23-468

Windjammer South

Read more…

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Tampa RV giant Lazydays to delist from Nasdaq

Tampa-based Lazydays Holdings Inc., one of Florida’s most recognized...

Granite Geek: New Hampshire might get access to ‘balcony solar’

I had solar panels put on my roof six...

TSX Today: What to Watch for in Stocks on Monday, November 10

Despite firm gold and silver prices, Canadian stocks...

While BNB and DOT Struggle Under Market Pressure, BlockDAG’s Presale Soars Past $435M!

As market-wide fear grips the sector, the Binance Coin...