STLLR Gold Inc. (TSX: STLR) (OTCQX: STLRF) (FSE: O9D) (“STLLR” or the “Company”) announces the remaining assay results from the infill and confirmatory drilling program at the Windjammer South Deposit at the Golden Highway Area (western end) of the Tower Gold Project in Timmins, Ontario, Canada. STLLR appoints James Gagne, P.Eng., MBA, as the Vice President, Projects & Technical Services.
This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20240404998068/en/
Figure 1: Tower Gold Project – General Location Map (Graphic: Business Wire)
Table 1: Windjammer South Drilling Highlights (See Figures 2 and 3 for the drill location map and section views):
|
Hole ID |
Deposit |
Result |
||
|
MGH23-468 |
Windjammer South |
|


